Again as with all sites, Safety and Integrity of the hoarding system was paramount with hoard-it complying with TWF and providing robust site specific wind calcs.
hoard-it were engaged by Henry Boot as the ideal solution for their hoarding requirements on the provision of a new Heli-pad site at the Sheffield Northern General Hospital.A no dig solution was a must as was the ability to erect with the minimum of disruption on a live hospital site. The slope was not an issue within the 93 lm which also incorporated our unique on ground vehicle gate system.