BAM Bradford College

BRADFORD

BAM Bradford College

Bam Leeds instructed hoard-it to undertake the hoarding on Bradford college, the need for on ground hoarding was paramount given the local services as was the corporatising of the hoarding on such a high profile project.

The 250 lm was adjusted as the installation progressed to suite Bam’s adaptations to the original layout with the project completed in 5 days.

BAM Bradford College hoard-it

What the customer thought

“This is a great system that uses sustainable timber which is completely reusable eliminating waste”

BAM Construction